Introducing a unique concept that dramatically reduces by around 90%, the wiring/installation time of multifunction power meters and current transformers. Imagine an installation time of 15 minutes per meter as opposed to the usual 60 minutes!

Save Time, Save Money

These savings are made possible due to the innovative design of both the current transformers and the meters, which allow plug-in connectors to be used for both current and voltage input/output. An RJ45 lead is used for connecting between the three-phase current transformer and meter, and 'readymade' plug-in leads are used for the voltage input. The meters are provided with both input and output voltage connections which allow up to 32 meters to be daisy-chained to a common supply voltage via the first meter.